òòò½ÊÓƵ

Are you a resident or business in the local area? Join our mailing lists

Footway adjustment at 165 Leith Walk

165 Leith walk plan

Site line will be adjusted on the east side of 165a Leith Walk to accommodate project works.

Pedestrian access will move back to the existing footway with arrangements expected to remain in place until Autumn 2022. 

Published: 19th August 2022