òòò½ÊÓƵ

Are you a resident or business in the local area? Join our mailing lists

Leith Walk surfacing works

Read more about the traffic management changes to facilitate surfacing works on Leith Walk.

Two-way traffic is scheduled to be in place for the full length from w/c 13 February 2023. Prior to two-way traffic returning there will be changes to traffic management arrangements to allow final surfacing works on the carriageway.

This will require the installation of a contra-flow system on Leith Walk on Wednesday 8 March 2023. This includes the closure of Steads Place for approximately one week, with access being maintained via Springfield Street. A temporary ramp will be installed on the central reservation to facilitate access and egress to Springfield Street.

Following these works there will still be localised footpath and surfacing works required. 

View the traffic management plan for Stead's Place to Springfield Street.
 

Published: 6th February 2023